{"aperture":2.8,"credit":"Christopher Drost\/Torontoist","camera":"Canon EOS-1D X","caption":"A new test streetcar leaves the Hillcrest yards as the Toronto Transit Commission commences on-street tests of its new fleet. The TTC hopes to have its new streetcar fleet active by 1st Quarter 2014 with full deployment by 2018.","created_timestamp":1363313936,"copyright":"\u00a9 2012 CJD\/SHiFTdigital","focal_length":"24","iso":"1000","shutter_speed":"0.04","title":"TTC Streetcar"}