<b>Construction of the elevated section of the Gardiner Expressway, 1959. City of Toronto Archives, Fonds 220, Series 65, File 37, Item 19.</b><br><br /> <br /> By the end of the 1950s, some politicians and local media grew impatient with the slow pace of construction, which wasn’t scheduled to end until 1965. “At such a pace,” noted a December 1959 <i>Globe and Mail</i> editorial, “Metro might not bother at all. The growth of traffic will far outstrip the growth of the road, and at the end of 10 years congestion will be worse than when the work was started.” Part of the blame was placed on Frederick Gardiner’s refusal to borrow more than $100 million a year to fund all Metro capital works projects.<br />
20140206westelevated
http://torontoist.com/wp-content/uploads/2014/02/20140206westelevated-100x100.jpg
http://torontoist.com/wp-content/uploads/2014/02/20140206westelevated.jpg
http://torontoist.com/wp-content/uploads/2014/02/20140206westelevated.jpg
1000
736
[]
20140206westelevated

Construction of the elevated section of the Gardiner Expressway, 1959. City of Toronto Archives, Fonds 220, Series 65, File 37, Item 19.

By the end of the 1950s, some politicians and local media grew impatient with the slow pace of construction, which wasn’t scheduled to end until 1965. “At such a pace,” noted a December 1959 Globe and Mail editorial, “Metro might not bother at all. The growth of traffic will far outstrip the growth of the road, and at the end of 10 years congestion will be worse than when the work was started.” Part of the blame was placed on Frederick Gardiner’s refusal to borrow more than $100 million a year to fund all Metro capital works projects.